Quantcast
Channel: Symantec Connect - Backup and Recovery - Discussions
Viewing all articles
Browse latest Browse all 6484

Planning for Tape vault and automation of the tape process

$
0
0
Oui, j'ai besoin d'une solution

Hi,

We have the following.

1. BE 2014 on Windows 2008 R2 SP2.

2. IBM Tape Library with two drives and 44 Slots. [Model - IBM TS3200].

3. I have created tape partition for each backup server, one for onsite and other partiton for offsite. I have create 8 tape partition all total.

 

Now , we are planning for taking backup on to the tape and making two seperate copy of the same bakup on to the tapes.

One tape partion set is for onsite(i.e. we will not remove the tapes from the Tape Library) and other tape partition is for offsite (we will remove the tapes for sending to a remote location/Bank).

I have created the onsite and offsite using the  "Add Stage" option to add the tape and duplicate the same backup on to a seperate Tape partition.

And along I have used the option ejection of tape after the tape completes.

I have created 2 media set for tape experition period. One for onsite and other media set for offsite.

Now, I have created media vault. I have associated the Media Vault for the offisite tape.

Please, help how this media Vault works and what happens when I put the tape inside this vault for offsite tape.

How to automate the offisite tape which need to be again inserted in the tape library.

Will there be a alert or is there any mail alert for the tape that need to again imsert the specific tape in the tape before the offsite tape backup.

 

Thanks.


Viewing all articles
Browse latest Browse all 6484

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>