No
Oui, j'ai besoin d'une solution
What will happen to taps allready scheduled with dpm and all of them been used if i want to kick dpm out of my production environment and replace BE.. is the taps will earsed or overwrite when i configure it and make my schedule backup on it ?
Thanks
0
9925751